Quantcast

Crews Work to Repair Cracks on Belmont Bridge - NBC29 WVIR Charlottesville, VA News, Sports and Weather

Crews Work to Repair Cracks on Belmont Bridge

Posted: Updated:
CHARLOTTESVILLE, Va (WVIR) -
Work is underway to patch up the Belmont Bridge in Charlottesville after cracks surfaced on the sidewalk and roadbed.

An engineer for the city says hot weather caused the asphalt to expand, but the city says the damage does not pose any danger. 

Crews were working to fill in those gaps Thursday with patching. The patching is just temporary while the city works through replacement options for the Belmont Bridge.

Crews set up a sign where they were working, telling pedestrians to use the other sidewalk. The sidewalk on the other side of the street, however, is also closed, forcing people to walk in traffic in order to cross the bridge.
  • Sign Up for Email Alerts

    Sign up to receive NBC29 news and weather updates in your inbox daily.

    * denotes required fields



    Thank you for signing up! You will receive a confirmation email shortly.
Powered by WorldNow
All content © Copyright 2000 - 2014 WorldNow and WVIR. All Rights Reserved. For more information on this site, please read our Privacy Policy and Terms of Service.