Quantcast

Diverging Diamond Interchange at Zion Crossroads to Open Feb 21 - NBC29 WVIR Charlottesville, VA News, Sports and Weather

Diverging Diamond Interchange at Zion Crossroads to Open Feb 21

Posted: Updated:

Virginia Department of Transportation

CULPEPER — On Feb. 21 the Virginia Department of Transportation will conduct an overnight traffic switch on the Zion Crossroads diverging diamond interchange (DDI) project on Route 15 in Louisa County.

Beginning at 9 p.m., all traffic through the work zone will be controlled by flaggers and police. Only through travel on Rt. 15 and right turns on and off Interstate 64 will be permitted. Vehicles wishing to turn left on and off the I-64 ramps will be redirected using short detours.

VDOT advises motorists of intermittent stops and delays on Rt. 15 during the traffic switch, which will be completed earlySaturday morning. Traffic on I-64 will not be affected.

In the event of inclement weather, the switch will occur overnight Feb. 22, beginning at 7 p.m.

When driving the new DDI configuration, motorists will proceed through a traffic signal at the interchange and follow their lane to the opposite side of the roadway. Motorists needing to access Interstate 64 will merge left using an on-ramp without having to stop or wait for oncoming traffic to pass. Through traffic proceeds to a second traffic signal and follows their lane back to the right side of the road.

Construction activity on the $6.88-million DDI will continue through its April 15 completion date. The interchange is being built by Corman Construction Inc. and is the first of its kind in Virginia. For more information and background, visit the Zion Crossroads Interchange project page on VDOT’s website.

  • Sign Up for Email Alerts

    Sign up to receive NBC29 news and weather updates in your inbox daily.

    * denotes required fields



    Thank you for signing up! You will receive a confirmation email shortly.
  1. A former University of Virginia associate dean who is facing federal child porn charges is expected to plead guilty on Monday.
Full Story
  • Memorial Services Scheduled for Gus Deeds

    Memorial Services Scheduled for Gus Deeds

    Friday, April 18 2014 9:14 PM EDT2014-04-19 01:14:50 GMT
    Memorial services for Gus Deeds, son of state Senator Creigh Deeds, are planned for the beginning of May.Full Story
    Memorial services for Gus Deeds, son of state Senator Creigh Deeds, are planned for the beginning of May.Full Story
  • Sexual Violence Survivors Make Glass Art at Take Back the Night Event

    Sexual Violence Survivors Make Glass Art at Take Back the Night Event

    Friday, April 18 2014 6:41 PM EDT2014-04-18 22:41:56 GMT
    Friday, some survivors of sexual violence got together to break a little glass, make art, and heal at the same time in Charlottesville.Full Story
    Friday, some survivors of sexual violence got together to break a little glass, make art, and heal at the same time in Charlottesville.Full Story
  • Powered by WorldNow
    All content © Copyright 2000 - 2014 WorldNow and WVIR. All Rights Reserved. For more information on this site, please read our Privacy Policy and Terms of Service.